2009 Net Metering Model Rules

On significant points such as size of systems eligible for net metering, program capacity caps, and treatment of annual excess generation, there has been broad variation between states. In an effort to capture this variation, IREC’s model rules now include footnotes that discuss the various approaches states have taken on these issues.

You may also be interested in

Feedback